Ingenieur Vol 63 Ingenieur Vol 63 2015 | Page 79

Professional Services of the “Non-Priority Sectors” with an end date of 2015 for liberalisation. BEM has achieved this date by gazetting the amended Act in February 2015. However it falls short in achieving foreign equity participation of 70% by 2015 in terms of access to anybody or persons. The state of affairs before the amendments to the REA were gazetted was alarming with no progress in the REA (in terms of foreign equity) except for multi-disciplinary practices when commitments have been made since 2006. Allied professionals such as architectural or quantity surveying services fared no better as shown in Table 3. EcoClean Technology EcoClean Technology Sdn Bhd It should be noted from Table 3 that Integrated Engineering Services is still unregulated in Malaysia. BEM in its future amendments to the REA is currently reviewing whether such engineering services should be regulated under BEM. Despite the Prime Minister’s budget announcement in October 2011 to allow foreign equity up to 100% by 2012, BEM has failed to achieve this milestone. Editor’s Note: Part 2 of this article will appear in The Ingenieur Vol 64, October-December 2015 issue. EcoClean Ausdrain EnviroModule™ CDS RAINWATER FILTRATION UNIT EcoClean Ausdrain EnviroModule™ SISTEM VAKUUM SDN. BHD. EcoClean Ausdrain Drainage Cell EcoClean Ausdrain EcoClean Ausdrain Drainage Cell Drainage Cell Contact US: EcoClean Technology Sdn Bhd Tel : +603-9171 8160 Fax : +603-9171 9160 Email : [email protected] Website : www.ecoclean.com.my Sistem Vakuum Sdn Bhd Tel : +603-9171 6445 Fax : +603-9172 6920 Email : [email protected] Vacuum Sewers Vacuum Valve Unit Vacuum Station List of Products / Systems Website : www.sistemvakuum.com 12A-02, 03 & 03A, Wisma Zelan, Jalan Tasik Permaisuri 2, Bandar Tun Razak, Cheras, 56000 Kuala Lumpur, Malaysia 77