Ingenieur Vol 62 April-June 2015 Ingenieur Vol 62 April-June 2015 | Page 55

White colour – normally associated with gas (compressed air/air conditioned), clean area Figure 8 summaries the S4-Standardization steps. Figure 8: S4 - Standardisation of users and as such encourage internal voluntary actions to implement guided activities (S1, S2 and S3) and sustain tip-top condition of things (tools, materials and machines) and workplace. Visual control is achieved by using visual aids. Visual aids must be designed to meet the above objectives and below are some kinds of effective visual aids. – Instruction notices to guide user to operate things or performing tasks; – Signage to aler t danger/hazard/safety precaution; – Indications of where things should be placed; – Labels on equipments or tools that designate name, application, specification; – Indications of material to inform type, category, application, specification, and quantity; and – Signage indicating the correct place or location. Colour coding is normally integrated into visual aids to improve users attention. Each colour associates with a specific expression of importance that is focused to improve awareness. For example, Green colour – good things, equipment in normal operation, things can be moved; Red colour – reject things, equipment in abnormal state or stop, safety hazard, hot area or surface; Yellow colour – things under repair or rework, temporary or transition state; Blue colour – normally associated with water; and S 5-Sustain (Shitsuke) Purpose. Sustain is about instilling the discipline and habit among members (users, workers) and other stakeholders so that they are equipped with the abilities to perform 5S activities according to the given steps and guidelines. Through this, the 5S movement can be consistently sustained as well as upgraded to accomplish the objectives. Method. Top-down management approach is essential to create the right discipline and habits. Careful strategy is required which must be executed across the organisation and progress must be monitored closely. As such a coordinating committee is recommended to manage the implementation of the 5S movement. The committee may be supported by a 5S consultant and together they conduct studies and prepare strategies for S5-Sustain which actually oversees the entire 5S movement. Basically there are three important steps that must &R