River Basin
Lupar
Anap
Kanowit
Katibas
Upper Rajang
Baleh
Baram
Tutoh
Tinjar
Limbang
Trusan
Lawas
Total
No. of Potential
Project
1
1
1
4
16
6
6
5
2
4
5
1
52
Installed Capacity
(MW)
54
118
110
436
10,725
2,811
2,878
1,048
253
582
786
165
19,966
Annual Energy Output
(GWh)
240
507
485
1,898
46,770
12,245
12,612
4,590
1,091
2,537
3,436
702
87,113
Table 2: Potential Hydropower Projects in Sarawak
Bakun HEP
14,750km2
695km2
228masl
Concrete Faced
Rockfill Dam (CFRD)
Dam Height
205m
Installed Capacity
2,400MW
Catchment Area
Reservoir Area
Full Supply Level
Dam Type
Figure 1: Batang Ai Hydroelectric Plant
Figure 2: Overall view of
Bakun Hydroelectric Plant
17