HSE International ISSUE 105 | Page 45

Down Pipe example. PROBLEM 003 Problem 003 is derived from problem 002. With most fire sprinkler systems, small branch pipework will also block, located in a manner shown as a ‘Down Pipe’. RigDeluge® Reducing Bush™ LESSONS 003 This problem was noted by a client who introduced the RigDeluge® CFT™ Adaptor to their systems. Where down pipes are used, debris will back up and may cause additional problems. From listening to the client and understanding the flow restrictions with the RigDeluge® CFT™ Adaptor (when used to protect pipework and not just a nozzle), RigDeluge® invented the RigDeluge® Reducing Bush™. This innovation allows a greater flow to pass through a systems branch pipework without having an effect on performance. SOLUTION 003 RIGDELUGE® REDUCING BUSH™ The RigDeluge® Reducing Bush™ is designed to protect small branch pipework where debris will have an impact on a whole system (not just the sprinkler head). With a multitude of sizes available, this fitting ensures a clear delivery fluid is achieved through all branch pipework. As noted with the RigDeluge® DDDF™, the RigDeluge® Reducing Bush™ will allow for predicative service and maintenance regimes to be implemented without outside assistance. Finally, after more than 40-years of using the same equipment proven to fail, the industry can move forward with an innovated product line invented through generations of product and services companies getting it wrong. We have provided a solution that will mitigate the ʹFail & Fixʹ processes used on fire sprinkler systems in the oil and gas industry today. COSTS 003 The RigDeluge® Reducing Bush™ will have a suggested retail price of £60-£80 per unit depending on size and quantity of the order. If you couple this with the RigDeluge® DDDF™ over a 10-system platform, you can achieve predictive service and maintenance for as little as £90K. If we put that into perspective, the products that will allow every operator in the world to reduce their service and maintenance costs and risks, as well as improve the performance of their safety critical fire deluge systems, are less than £100K. HSE INTERNATIONAL 45