GeminiFocus July 2016 | Page 22

Almost simultaneously, panel installation on the roof of HBF (Figures 3 and 4) started in late May 2016 and ended in mid-June 2016. Cabling of the system was completed on June 15, 2016, and the panels are now online. Alexis Ann Acohido is a Media Relations and Local Outreach Assistant at Gemini North. She can be reached at: [email protected] Figures 3-4 Installation of photovoltaic panels on rooftop of Gemini’s Hilo Base Facility in Hawai‘i (top and bottom). 20 GeminiFocus July 2016