Almost simultaneously, panel installation on
the roof of HBF (Figures 3 and 4) started in
late May 2016 and ended in mid-June 2016.
Cabling of the system was completed on
June 15, 2016, and the panels are now online.
Alexis Ann Acohido is a Media Relations and Local Outreach Assistant at Gemini North. She can
be reached at: [email protected]
Figures 3-4
Installation of
photovoltaic panels on
rooftop of Gemini’s Hilo
Base Facility in Hawai‘i
(top and bottom).
20
GeminiFocus
July 2016