GANGA 57th Issue | Page 7

the Nile flooded, leaving several layers of command area is bound by the Vindhyan fertile soil behind, aiding in agricultural foothills in the North and the proposed right growth. Peret was the growing season and bank flow canal of the Omkareshwar Project Shemu, the last season, was the harvest in the South. On either side, it is bound by season when there were no rains the Ghatwal river and the watershed of the The Egypt land has not experienced Uri river and the Wagur nala respectively. flooding since the construction of the Aswan The catchment up to dam site is 690 sq. km. Dam, in 1902 and raised to its current height The state government policy for the sixty years later. Narmada Projects that was made in 1987 RIVERS OF INDIA and firmed in 1992 also required that the Narmada the daughter of Lord Shiva affected people must be resettled with land for land. Despite this, from 1991 to 1994 the Part-11 4) Maan Dam state government completely failed to meet The Maan dam is one of the 30 large dams the that has been planned as part of the Narmada clearance and the provisions of its own Valley Development Project (NVDP). It is policy and paid people with small cash being constructed on the river Maan a compensation. As a result, in 1994, the tributary of Narmada River as an irrigation Appraisal project in the Dhar district of Madhya Environment Ministry blacklisted the Maan Pradesh. It received the environmental Project for complete violation of the clearance from the Ministry of Environment conditions of the environmental clearance. in 1994. The Draft Appraisal of the Man River The Project will have a full reservoir level of Project details includes 22 villages in 297.65 m. The maximum height of the Manawar masonry dam above river bed level is Gandhwani block of Dhar District - a total 52.4 m, of the overflow dam 44.09 m and of of 53. However, the status report of the the earth dam will be 33.9 m - a level of Narmada Valley Development Department 300.4 m for all 3 dams. The length of the lists 56 villages by name. Right Bank Canal will be 11.64 m and of the The 1998 status report of the NVDD left Bank canal will be 10.02 m. mentions The Culturable Command Area of the 1094.886 ha for a total of 17 villages. Project will be 15,000 hectares. Forest Area to be submerged around 4.5 ha The conditions of the Committee block a and reservoir of 31 environmental the Central villages submergence in of 7 Integrated River Basin Management Society