Firestopping Book Firestopping Book | Page 78

Pipe Penetration ENGINEERING JUDGMENT FIRESTOP DETAIL DS PROJECT : CONTRACTOR : F RATING OF ASSEMBLY : 2 HOURS A A 1 2 3 5 4 THIS ENGINEERING JUDGMENT REPRESENTS A FIRESTOP SYSTEM Pipe THAT WOULD (Fig 3.15- EJ) BE EXPECTED TO PASS THE STATED RATINGS IF TESTED. (REFERENCE : UL SYSTEM NUMBER C-AJ 2567, C-AJ 8143) HILTI India Pvt Ltd. 6th Floor Building 8 Tower C, DLF CyberCity Phase II, Gurugram - 122 002 Hilti Firestop Systems Designed by Sheet 1/2 Scale Not to scale Date Representative only Saving Lives through Innovation and Education 27TH APRIL, 2018 Drawing No. 038_EJ_DS _MOTERA_ L&T _20180427A