Pipe Penetration
ENGINEERING JUDGMENT FIRESTOP DETAIL
DS
PROJECT :
CONTRACTOR :
F RATING OF ASSEMBLY : 2 HOURS
A
A
1
2
3
5
4
THIS ENGINEERING JUDGMENT REPRESENTS A FIRESTOP
SYSTEM Pipe
THAT WOULD
(Fig 3.15-
EJ) BE EXPECTED TO PASS THE STATED RATINGS IF TESTED.
(REFERENCE : UL SYSTEM NUMBER C-AJ 2567, C-AJ 8143)
HILTI India Pvt Ltd.
6th Floor Building 8 Tower C, DLF CyberCity
Phase II, Gurugram - 122 002
Hilti Firestop Systems
Designed by
Sheet
1/2
Scale Not to scale
Date
Representative only
Saving Lives through Innovation and Education
27TH APRIL, 2018
Drawing No.
038_EJ_DS
_MOTERA_
L&T
_20180427A