Duct Penetration
ENGINEERING JUDGMENT FIRESTOP DETAIL
DS
PROJECT :
CONTRACTOR :
F RATING OF ASSEMBLY : 2 HOURS
3"
A
FRONT VIEW
A
2
4
3
1
5
SECTION A-A
(Fig 3.13- Duct EJ)
THIS ENGINEERING JUDGMENT REPRESENTS A FIRESTOP SYSTEM THAT WOULD BE EXPECTED TO PASS THE STATED RATINGS IF TESTED.
(REFERENCE : UL SYSTEM NUMBER C-AJ-7051, WJ-7109, C-AJ 7145)
HILTI India Pvt Ltd.
6th Floor Building 8 Tower C, DLF CyberCity
Phase II, Gurugram - 122 002
Hilti Firestop Systems
Designed by
Sheet
1/2
Scale Not to scale
Date
Representative only
Saving Lives through Innovation and Education
28th March, 2018
Drawing No.
015_EJ_DS
_DAICEC
_VOLTAS
_20180328