Quarters are based on calendar year.
2018
2018 STREET MAINTENANCE PROJECTS (Street Reclamation)
No design or right-of-way are required for the annual street maintenance projects. Schedule is tentative
and subject to change upon award of contract.
Proposed Construction
Under Construction
Completed
Amberwood Court (Englishoak - East end)
Bama Drive (Green Oaks - Drew)
Driftwood Court (Englishoak - East end)
Englishoak Drive (Royaloak - Perkins)
Forestcreek Court (Englishoak - East end)
Howell Street (Osler - East of Pee Wee
Lakehurst Court (South end - Englishoak)
Lakehurst Drive (Englishoak - Arkansas)
Lakewood Drive (Arkansas - Woodland Park)
Mansfield Road (Green Oaks - Thames)
Royaloak Drive (Englishoak - Arkansas)
Woodsong Trail (Lakehurst - Englishoak)
Q1
Q2
Q3
Q4
Quarters are based on calendar year.
2019
2019 STREET MAINTENANCE PROJECTS (Street Reclamation)
No design or right-of-way are required for the annual street maintenance projects. Schedule is tentative
and subject to change upon award of contract.
Proposed Construction
Under Construction
Completed
Q1
Q2
Q3
Q4
Collins Street (Abram - Division)
110th Street (Randol Mill - Ave E)
Mitchell Street (Collins - Mary)
Foxford Trail (Kilrush - Irish Glen)
Irish Glen Drive (Center - Shea)
Kilrush Drive (Irish Glen - Mayfield)
Killala Court (Kilrush - South end)
Shawn Court (Volunteer - North end)
Shea Court (Volunteer - North end)
TxDOT Improvements on 7 Miles of Arlington Roadway
The Texas Department of Transportation (TxDOT) has
begun a $6.4 million pavement overlay project on sections
of FM 157 (Cooper and Collins Streets), and SH 180
(Division Street) in the City of Arlington. This project will
remove existing pavement, repair the roadway, and lay a
new asphalt road surface.
To minimize the impact of traffic delays, TxDOT will utilize
two paving crews. One crew will work on Division Street
between Fielder Road and SH 360, while the second crew
will be assigned to FM 157. The second crew is anticipated
to begin on the Collins Street section of FM 157, and then
move to the Cooper Street section, near the University of
Texas at Arlington.
All paving activities will be restricted to 9 p.m. to 5 a.m.
Sunday through Thursday; however, single lane closures will be permitted for miscellaneous preparation
activities between 9 a.m. and 3 p.m. Work is anticipated to be completed by the end of 2019 and will improve
seven miles of Arlington roadways.
6