e-mosty September 2018 Vessels and Equipment Used for Bridge Construction | Page 82

DECK ERECTION OVER WATER (Main and Side Spans) Advantages of Producing the Steel Towers and Deck locally in Turkey include: The steel deck sections for the suspended spans over water (i.e. for the main and side spans) were erected by the Turkish fabricator Çimtaş under the EPC Contractor’s supervision (IHI-ITOCHU JV). Sea transportation of the manufactured elements for the steel towers and deck in distant foreign countries could have increased the risk of fatigue due to the following.  The need to stack superstructure sections on vessels  The potential for wave actions induce fatigue stresses in superstructure sections Following activities were completed for the deck:  Deck Panel Fabrication; Steel was cut and welded to form stiffened panels at the ÇIMTAS Gemlik factory. Potential fatigue transportation  Potentially shortened fatigue life of in-place structure The deck panels were fabricated at the “Çimtaş factory” 60 km southwest of bridge sitethen delivered to the “Çimtaş Shipyard” km east of bridge site and assembled to form deck segments 36m wide and 25m long. Deck Segment Assembly; All semi-finished product panels coming from the ÇIMTAS Gemlik Works were delivered to ÇI TAS Gölcük Works on trucks Panels were assembled by welding and assembling into a semi- segment and then these semi-segments were transported and manoueuvred at the assembly yard by SPMT. Semi segment to full segment assembly was performed in open areas, and shelters were used to cover welding areas.In total 87 decks segments were made. Trial Assembly; Each completed segment was trial assembled with its adjacent segments. cracking during sea Minimising Disruption to İzmit Bay navigational canal Traffic The works were planned and carried out very carefully to avoid disrupting canal traffic. The shipping channel was changed several times by Harbour Master to arrange optimum working conditions for bridge erection and passing ships. Transportation of Deck Segments: Deck Erection; Deck segments were transported on a barge in approximately 3 hours of sailing time to the construction site for erection by floating crane or by lifting devices. Deck segments with a size off 25 or 50m long x36m wide were transported by self propelled barges from Gölcük Shipyard to the their final locations. approx. 30 km Figure 44: Marine Transportation of Deck Segments With three Barges “Rising Sun”, “Ay Yıldız” and “GMK-1” 3/2018