Figures 30 and 31 : Temporary precast elements transported by barge “INKA” and erected with floating crane “Herkül”
CRAWLER CRANES, MOBILE CRANES and SELF-CLIMBING
CRANES
The 250 ton crawler cranes and 60 ton capacity mobile
cranes used at the tower base were transported and
lifted onto temporary working platforms by floating
crane “Taklift 7”, see figures 32 – 35 below.
Figure 32: 250 ton crawler crane installed on South Tower
Working Platform by “Taklift 7”
Figure 34: 60 ton crane installed on South Tower
Working Platform by “Taklift-7”
Figure 33: 250 ton crawler crane and 60 ton mobile crane
installed on North Tower Working Platform
Figure 35: Self Climbing Crane at “Yaşarsan Yard”