e-mosty September 2018 Vessels and Equipment Used for Bridge Construction | Page 78

Figures 30 and 31 : Temporary precast elements transported by barge “INKA” and erected with floating crane “Herkül” CRAWLER CRANES, MOBILE CRANES and SELF-CLIMBING CRANES The 250 ton crawler cranes and 60 ton capacity mobile cranes used at the tower base were transported and lifted onto temporary working platforms by floating crane “Taklift 7”, see figures 32 – 35 below. Figure 32: 250 ton crawler crane installed on South Tower Working Platform by “Taklift 7” Figure 34: 60 ton crane installed on South Tower Working Platform by “Taklift-7” Figure 33: 250 ton crawler crane and 60 ton mobile crane installed on North Tower Working Platform Figure 35: Self Climbing Crane at “Yaşarsan Yard” 3/2018