SPECIFICATION OF VESSELS AND EQUIPMENT
(Click on “pdf” box to open the leaflet)
UNDERWATER PILE DRIVING VESSEL AND EQUIPMENT BEDDING VESSELS AND EQUIPMENT
All equipment and vessels were newly designed and built
for this challenging project. For this challenging work, executed at a depth of -40/-
43m, STFA Project Management used unmanned
equipment, for safety reasons, to achieve a levelling
tolerance of +/- 5cm.
Kapıkulu Pile Driving Barge and inclusives
LR-1300 Crawler Crane
Pile Driving Frame specially designed and constructed by
Körfez Deniz Construction Co. which is Specialist Sub-
Subcontractor of STFA for Inclusion Pile Driving
Underwater.
IHC S280 Hydraulic Hammer drove 194 inclusion piles (2-
195) for North Tower Foundation and, IHC S200 Hydraulic
Hammer drove 195 inclusion piles (1-195) for South
Tower Foundation (Rented from IHC through Körfez
Deniz Co.)
ICE 125 Diesel Hammer drove first inclusion pile at North
Tower Foundation before the arrival of IHC S280
Hydraulic Hammer to site and kept stand-by for the rest.
ULE (Underwater Levelling Equipment)
Alpaslan-2 floating crane
and Fall Pipe Barge.
3/2018
STFA provided FEED Design and special requirements to
his “Specialist Subcontractor ARAS Marine Construction
Co.” for two equipment; Fall Pipe Barge and ULE
(Underwater Levelling Equipment (Robot)), and Funda
Makina designed and constructed these 2 special
equipment items for the project.