e-mosty September 2018 Vessels and Equipment Used for Bridge Construction | Page 52

Figure 3 : Navigational arrengements around Osmangazi Bridge location Summary Vessels and marine equipment were carefully studied and selected to achieve the tight schedule for construction of the Osmangazi Bridge. The main selection parameters were as follows:  Conditions of the job site, in particular navigational requirements including depth, speed and other constraints  Size and weight of modules transported and installed  Method of transportation and installation of modules Prefabricated offices were installed on temporary working platforms at each tower and at “Yaşarsan” and “Gölcük” shipyards. All vessels were equipped with life saving and health safety and environmental (HSE) equipments. Selected vessels and equipment were generally used as planned, hovewer several actions were necessary to compansate for time lost due to poor weather conditions during construction. Although the construction site in İzmit Bay was to some extent protected from adverse effects of the sea; wave heights and wind speeds imposed limitations, especially on lifting operations using floating cranes. The width and location of the navigational channel changed several times during construction activities, in coordination with the Harbor Master and other maritime authorities. Self propelled vessels with dynamic positioning systems were used to erect the tower and deck segments. Non self propelled barges were towed by tug boats and used in secondary works like transportation of temporary elements. 3/2018 Figure 4 : Offices on South Tower working platform