e-mosty September 2017: Mersey Gateway Bridge. Arenales Bridge. Mersey Gateway Bridge. Arenales Bridge. BLWT. | Page 57

e-mosty December 2017: Movable Scaffolding Systems Professor Pedro Pacheco, BERD Overhead MSS M45-S with OPS system in Highway Construction in Slovakia CHALLENGES INCREASE IN TRAVELLING WEIGHT VERY DEMANDING FORMWORK PROJECT DUE TO THE PROXIMITY OF THE DECKS AND THE RADIUS OF CURVATURE ON PLAN (LOW AND VARIABLE) ALLOWING THE CLIENT THE 4TH REUSE OF THEIR OWN EQUIPMENT SOLUTIONS CALCULATIONS CARRIED OUT IN ORDER TO INCREASE THE TRAVELLING WEIGHT AND KEEP THE MODIFICATION COSTS AS LOW AS POSSIBLE IN ACCORDINGLY TO THE CLIENT’S EXPECTATIONS WORK DONE TOGETHER WITH THE FORMWORK SUPPLIER IN ORDER TO ENABLE LAUNCHING RESULTS CONSTRUCTION PERIOD: 48 WEEKS HIGH CONSTRUCTION QUALITY AND DEFORMATION CONTROL HIGHLY OPTIMIZED DECK CONSTRUCTION HIGH SAFETY LEVELS DURING CONSTRUCTION 3/2017