CHALLENGES
INCREASE IN TRAVELLING WEIGHT
VERY DEMANDING FORMWORK PROJECT DUE TO THE PROXIMITY OF THE DECKS AND THE
RADIUS OF CURVATURE ON PLAN (LOW AND VARIABLE)
ALLOWING THE CLIENT THE 4TH REUSE OF THEIR OWN EQUIPMENT
SOLUTIONS
CALCULATIONS CARRIED OUT IN ORDER TO INCREASE THE TRAVELLING WEIGHT AND KEEP
THE MODIFICATION COSTS AS LOW AS POSSIBLE IN ACCORDINGLY TO THE CLIENT’S
EXPECTATIONS
WORK DONE TOGETHER WITH THE FORMWORK SUPPLIER IN ORDER TO ENABLE LAUNCHING
RESULTS
CONSTRUCTION PERIOD: 48 WEEKS
HIGH CONSTRUCTION QUALITY AND DEFORMATION CONTROL
HIGHLY OPTIMIZED DECK CONSTRUCTION
HIGH SAFETY LEVELS DURING CONSTRUCTION