e-mosty March 2018. Naeem Hussain. Bridges. Naeem Hussain. Bridges. | Page 67

- Ting Kau Bridge (1993) - Concept and Design Leader for the tender design of the precast concrete box girder viaduct approach to the main bridge, with pier heights in excess of 50m. - MTRC Rambler Channel Bridge (1994) - Design Leader for the winning tender by Dragages for the design and build double deck precast concrete segmental balanced cantilever bridge with spans of 80m. - Route 3 Kwai Chung Viaduct (1993) - Design Leader for alternative design of viaduct for Dragages, based on precast prestressed U-beams. The piling quantities were reduced by 70% in comparison to the conforming design. - MTRC Tsing Yi Viaduct (1992 - 1996) - Concept and Design Leader for the detail design of MTRC Tsing Yi multi-level prestressed concrete box girder viaduct for the Lantau and Airport Line. - Tuen Mun Road Widening (1994 - 1996) - Bridge leader for widening of bridges on the 8.5 km dual 3-lane highway. - MTRC Sea Channel Bridge (1992) - Value Engineering Design of the Sea Channel bridge for the Lantau and Airport line. The proposed push launched box girder bridge was adopted by MTRC. - Kap Shui Mun Bridge and Ma Wan Viaduct (1992 - 1993) - Design Leader for the tender design for Gammon Construction Ltd for the 408m span cable-stayed bridge. Both the bridge and the viaduct were designed in precast prestressed segmental concrete construction, to carry the road and rail access to the new Chek Lap Kok airport. M40 Warwick-Oxford Motorway UK (1985) Detail design of over and under bridges in prestressed concrete on the M40 Motorway 1984 – 1985 Gammon Construction Co Ltd Pakistan Detail design of multi-storey building in Jeddah, Saudi Arabia 1982 – 1984 Arup Hong Kong - Mass Transit Railway Corporation Chai Wan Depot, Hong Kong - Detailed design of access bridges. - Tuen Mun Park, Phases I and II and Old Peak Road/May Road Improvement Scheme - Preliminary and detailed design of bridges. - Hong Kong Air Cargo Terminal Extension, Hong Kong (1982 - 1983) - Detailed design of access bridges. 1979 – 1982 Arup Nigeria – Ibadan - Imo River Bridge Nigeria (1980 - 1982) - Preliminary and detailed design of 2-lane continuous 810m long segmental balanced cantilever box girder bridge of 80m spans. - Upuoko-Eket Opobo Road Nigeria (1979 - 1981) - Preliminary and detailed design of 2-lane continuous prestressed twin rib bridges. - Irele - Ojuala Road Nigeria (1979 - 1981) - Preliminary and detail design of 2-lane continuous reinforced concrete swamp crossings, 910m and 630m 1/2018