e-mosty March 2018. Naeem Hussain. Bridges. Naeem Hussain. Bridges. | Page 62

Naeem Hussain Profession Civil Engineer Current Position Director Arup Fellow Global Bridge Leader Naeem’s education in both engineering and architecture has enabled him to combine the best of both disciplines in winning international bridge design competitions and designing award winning bridges for both road and rail. Naeem’s success in bridge engineering can be illustrated by several award winning projects. Most recently, he was the Project Manager for the detailed design and construction supervision for the Hong Kong Stonecutters Bridge, a cable-stayed bridge with a main span of 1018m, the third longest cable-stay span in the world, which has won several awards including the IStructE Supreme Award 2010. Naeem is Arup’s global bridge leader and has over 55 years experience of structural civil and bridge engineering works around the world. Joined Arup 1969 Years of Experience 55 Nationality Pakistani/ British Qualifications BSc (Eng), The West Pakistan University of Engineering and Technology, 1962 Design Studies, Architectural Association School of Architecture, London, 1967 DIC, MSc (Concrete Structures), Imperial College, University of London, 1971 Professorships Adjunct Professor – Technological and Higher Education Institute, Hong Kong Awards The Royal Academy of Engineering – Prince Philip Gold Medal 2012 for Exceptional Contribution to Engineering He was the concept and lead designer for the competition and award-winning Hulme Arch Bridge in Manchester which has been described as the “show-piece for the civil engineering profession” and was awarded the Millennium Product Status fully recognising its innovation, creativity and pioneering qualities within the bridge field. Another notable project is the 10km combined rail and road Øresund bridge crossing between Denmark and Sweden in which Naeem was a key member of the original design team that won the international design competition for the bridge which has a double deck main cable stayed span of 490m, and approach spans of 140m. The Øresund bridge received the IABSE outstanding Structure Award. Since February 1998 Naeem has been based in Hong Kong. He was the Engineering Manager for the detailed design of KCRC West Rail Yuen Long Section which comprises 9km of precast segmental post-tensioned viaducts with spans up to 90m, and three elevated stations each 400m long. The KCRC viaducts include innovative noise attenuation systems. Naeem has also been involved in other major infrastructure projects in Hong Kong including Route 8 Cheung Sha Wan to Tsing Yi; Ground Transportation Centre at Chek Lap Kok Airport; MTRC Tsing Yi Railway Viaduct, Shenzhen Western Corridor and Deep Bay Link bridges, viaducts and cable-stay bridges on the 40km Hong Kong-Zhuhai-Macao Link. He was the Main Bridge Design Leader for the unique 1/2018