3.5 Dry Air Supply Piping and Injection/Exhaust Sleeves The dry air developed in the plant rooms was required to be delivered to the cable by High-Density Polyethylene (HDPE) piping. The pipework was routed to the injection sleeves on the cable by messenger strands connected to the hand rope stanchions on the cable. The HDPE pipework was spirally lashed to the messenger strands for near-continuous support (Figure 22). The injection and exhaust sleeves are horizontally split stainless steel assemblies that accommodate either the injection pipe or exhaust port and integrate a network sensor box for data collection and monitoring purposes (Figure 24). Figure 24. Cable injection sleeve (note sensor box on top) Figure 22. HDPE dry air supply pipework The rigid HDPE pipework was transitioned to flexible stainless steel braided pipes where relative movement needed to be accommodated, such as at the injection sleeves on the cables (Figure 23). Prior to installing the sleeves, the wrapping material and any existing wire wrapping was removed. The cable wires were wedged slightly open with zinc wedges to promote air ingress or egress. The two halves of the sleeves were then installed with specific circumferential and longitudinal gaskets and sealants. Similar to the cable bands, the objective is a robust, airtight and weather resistant seal. 3.6 Supervisory Control and Data Acquisition System A supervisory control and data acquisition (SCADA) system was developed based on contract requirements to remotely monitor the plant rooms and cable sensors, as well as continuously collect the data from each. In addition, the SCADA network provides the feedback loop between the cable sensors and the plant room, as well as the plant room equipment and plant room program logic controller, such that the control system can adjust the system to maintain set-points for cable injection pressures and plant room relative humidity, respectively. Figure 23. Flexible stainless steel pipe transition to injection sleeve To monitor the dehumidification process, sensors are installed at the injection and exhaust sleeves on the cables in NEMA 4X boxes to protect them from the harsh atmospheric environment (Figure 25). 2/2017