e-mosty December 2018 e-mosty December 2018 | Page 70

Figure 10: Longitudinal girders and lateral beams frame CONSTRUCTION The superstructure was erected by using a cable- hoisting construction method. The single steel tube arch rib was divided into six parts – the weight of each section is less than 400kN (40 tonnes) – for precast segment assembly. Erection of hollow slabs and box rib arch was also assisted by cable-hoisting construction method. The total weight was more than 40,000kN, which meant rapid construction and efficient use of equipment. The construction of floating continuous frame system is as follows: 1) Fabricating a rectangular small frame which consists of two short lateral beams (length 3.6m) between the adjacent suspenders and the longitudinal girders on both sides (length 5m) The corresponding size is 3.6m (width)×7.6m (length)×(1.17~1.33 m)(height), as shown in Figure 11. 2) After attaining the required design strength, the rectangular small frame is hoisted by cable lifting system, as shown in Figure 12. Figure 11 ↑: Precasting rectangular small frame Figure 12 →: Hoisting small frame 4/2018