e-mosty December 2018 e-mosty December 2018 | Page 33

Relevant Achievements Selected Recent Completed and Current Bridge structures: 3 rd Narmada Bridge (2012): Tender design for a multi-span cable supported 1.5km river crossing. Jamarat Bridge, Mecca, Saudi Arabia. (2011) Multi level building for pilgrimage near Mecca. 60-974m clear transverse spans, 600m long. Multi-level – 4 in phase 1, 5 in Phase 2. Construction on the first level in less than 10 months to not disrupt the pilgrimage. Design of a 2 storey structure to carry exceptional loads which could also be built in a location with limited access to be completed in less than a year including demolition of the previous structure. Bandra-Worli Sealink (2009) 500m long cable stayed bridge and 2.3km of approaches across the sea (with additional 150m span cable stay bridge). Precast segmental construction. One of the longest span bridges in India and the longest bridge across the sea in India. University Circle & Agricultural Circle Flyover’s Pune (2007) 1.6 km of urban viaduct including complex bifurcations done entirely with precast elements. Wadi Abdoun Bridge, Jordan (2006). (Shortlist for British Construction Industry Award, 2007 and IStructE Awards, 2007) A continuous cable stayed bridge of outstanding conceptual design. ‘S’ shaped precast segmental cable-stayed multi-span. Main spans 134m. ‘Y’ shaped towers in a highly seismic region. Wadi Leban Bridge, Saudi Arabia (2000). Concrete cable stayed bridge with 410 m main span, single precast deck 36m wide, central plane of cables. Commended, British Construction Industry Awards, 2000. International Category. Longest cable-stayed bridge in the Middle East since 2000 and for 16 years the longest single plane concrete cable-stayed bridge in the world. Shaikh Isa bin Salman Bridge, Bahrain (1998). Cable stayed bridge using pre-compressed stays. Single deck 36m wide with central plane of stays. Precast segmental. FIP Outstanding Concrete Structures Award 1998. Shortlist. Sungai Prai Bridge, Malaysia (2006). Main span cable stayed bridge 185m with approaches on both sides with 50m spans. Institution of Structural Engineers Awards 2006. Winner Award for Transportation Structures. Winner of Supreme Award. JJ Hospital Viaduct, India. (1999). The longest urban viaduct in India on completion. Particularly constricted urban location in the centre of Mumbai. Association of Civil Consulting Engineers, India: FOSROC AWARD. 2000. Second Narmada Bridge, India (1997). A 1.3 km long river crossing with 95m spans. The first BOT bridge in India. Design of temporary works including the launching girder. Indian Institute of Bridge Engineers: Winner Most Outstanding Bridge National Awards 2000 Bridge Across the Straits of Malacca. (1997). Concept design studies for 1200m and 900m cable stayed bridges. Approaches 350m cable stayed bridges constructed on shore and floated into position. Limbang Bridge, Malaysia (1994). 100m span composite box girder with unique erection method for river crossing in rainforest area. Yangtze River Bridge, China (1993). Preliminary Engineering Design for a cable stayed bridge 1100m main span. 4/2018