THE EVOLUTION OF MOVABLE SCAFFOLDING SYSTEMS AND THEIR APPLICATION IN CONSTRUCTION OF THE SPANISH HIGH SPEED TRAIN LINE Antonio Póvoas, AP- Bridge Construction Systems – Portugal, Ltd. Figure 1: Almonte Viaduct – Approach of nose MSS to central span Introduction The evolution of pre-stressing technology has allowed bridge designers to face the construction of bridge decks using continuous spans and increasing their length, aiming to reduce the cost and duration of bridge construction. Movable equipment for the construction of the decks are evolving according to this tendency and sometimes preceding it, allowing larger spans to be built in shorter periods. The mobile equipment for building bridge decks are basically divided into two main groups:   For building decks with precast beams, segments or the entire deck there are special equipment that we shall not discuss in this article. For building decks “in situ” there are basically three groups of movable equipment: 1. Movable formwork tables 2. Movable Scaffolding Systems (MSS) - Underslung - Overhead Precast decks or segments Cast “in situ” decks or segments 3. Travellers (not analysed in this article) 4/2017