e-mosty 4 2016 Arch Bridges | Page 7

ALMONTE HSR VIADUCT OVER THE ALCÁNTARA RESERVOIR IN SPAIN Commencement of works:2011 Opening of the bridge to traffic: 2016 Location: Alcantára Reservoir – Garrovillas, Cáceres, Spain Client: ADIF AV (Spanish Rail Administrator), Madrid, Spain Type: concrete HSR arch bridge Total Length:996m Main span: 384m Conceptual and detailed design: Arenas & Asociados, Santender, Spain and IDOM Ingenieria, Madrid, Spain JV Design engineers: Guillermo Capellán, Héctor Beade, Javier Martínez and Emilio Merino (Arenas y Asociados) Main Contractor: FCC Construcción - Conduril Engineering JV 4/2016