ALMONTE HSR VIADUCT
OVER THE ALCÁNTARA RESERVOIR IN SPAIN
Commencement of works:2011
Opening of the bridge to traffic: 2016
Location: Alcantára Reservoir – Garrovillas, Cáceres,
Spain
Client: ADIF AV (Spanish Rail Administrator), Madrid,
Spain
Type: concrete HSR arch bridge
Total Length:996m
Main span: 384m
Conceptual and detailed design:
Arenas & Asociados, Santender, Spain and IDOM
Ingenieria, Madrid, Spain JV
Design engineers: Guillermo Capellán, Héctor Beade,
Javier Martínez and Emilio Merino (Arenas y
Asociados)
Main Contractor: FCC Construcción - Conduril
Engineering JV
4/2016