TAGUS RIVER HSR VIADUCT
Photo: Carlos Manterola for Carlos Fernandez Casado
Commencement of works:
Foundations commenced in summer of 2011
Location:
Alcantára Reservoir – Cañaveral, Cáceres, Spain
Opening of the bridge to traffic:
Completion of works in September of 2017
Client:
ADIF AV (Spanish Rail Administrator), Madrid, Spain
Type: concrete HSR arch bridge
Conceptual and detailed design:
Carlos Fernandez Casado, S. L.
Total Length: 1.488m
Main span: 324m
Design engineers:
Javier Manterola, Antonio Martínez, Borja Martín,
Silvia Fuente, Miguel Ángel Gil, Lucía Blanco
Main Contractor:
COPISA-COPASA JV.
4/2016