DOT | Page 17
Current Pavement Conditions
Current Pavement Condition
Other Assets
Maintained and/or
Managed by LCDOT
ARGUS System optimizes improvements
2013
Failing 11%
Satisfactory
21%
2012
2011
Backlog 2%
2010
2009
year
(partial list)
History of Pavement
Condition
2008
2007
2006
2005
2004
2003
• 357 highway bridges
2002
2001
2000
Good 66%
LCDOT 4/13
Source: 2012 pavement testing
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
rank by percent of total area
Backlog
Failing
Satisfactory
Note: Current year rankings are based on
the previous year's testing.
• 20 bike and pedestrian bridges
Good
Prepared by LCDOT 4/13
Source: 2012 pavement testing
• 19 miles of guardrail
• 14,783 storm sewer structures
• 45 stormwater facilities
• 659 culverts
Sufficiency Ratings:
Lake County's Bridges
Early repairs are most cost effective
35 Bridges Rated
Average Rating: 90
100
Result of Overlay Treatment
Surface Maintenance
$550,000
Thin Overlay
$600,000
90
65% of life
25% quality drop
7 bridges
80
• 161 signal controllers
• 200 miles of storm sewer pipe
Mill, Thin Overlay with Fabric $750,000
pavement condition
70
Mill, Overlay with Fabric
• 42,795 feet of fencing
$875,000
Medium Overlay
$1,650,000
Thick Overlay
60
$1,785,000
Pavement Deterioration
Curve
• 19,642 signs
20 Year Road Design Life
50
40
Reconstruction
$4,415,000
• 16,355 feet of retaining wall
30
20
10
0 bridges
Treatment
Cost
Per Mile
Maintenance
Treatment
Required
28 bridges
0
0
2
4
6
8
10
12
14
pavement life, years
16
18
20
22
24
26
• 36 railroad crossings
• 53 miles of 4’ paved shoulder
Source: Adapted from The Maintainer, Nov/Dec 1986
Revised 4/13 LCDOT
<<< worse
lower than 50
better >>>
50-80
higher than 80
Executive Summary •