Drainage & Plumbing
Our BioPure Range of
Sewage Treatment Plant
Suitable for homes without access to
mains drainage
Discreet solution to on-site sewage
treatment
10 models in the range with a
capacity up to 50pe
CE Marked and EN 12566-3 Certifi ed
Uses the extended aeration method
to treat sewage
96% effi ciency allows a typical 3-5
year emptying interval
Visually unobtrusive and odourless
25 year warranty on GRP & 2 year
warranty on the air pump
Deal direct with the UK Manufacturer
Flowpath Range for Commercial &
Leisure Sites 55+
Please call 01746 781782 or visit
www.webuildit-ltd.co.uk or
www.bio-pure.com
New Screed Partnership Reinforces
Giacomini UK’s Complete System
Warranty
Giacomini UK has announced a partnership
with a leading screed manufacturer to
provide a combined ten year system
warranty. This will offer a level of assurance
to customers that is not offered by another
company within the industry.
The partnership allows Giacomini to offer
premium, top level cover to its customers.
Giacomini’s installed UFH systems already
boast a ten year system warranty but
this previously had not extended to the
screeding. However, thanks to the new
agreement, the screed work will be covered
through a combined warranty package.
The combined warranty is available on
Giacomini’s new Spider low profile UFH
system, which can achieve a total system
height of between 25-31mm. This results
in a significant reduction in floor weight
and therefore structural loads, resulting in
potential cost savings.
The reduction in system height
also adds valuable extra space,
particularly for multi-storey
projects like apartments
and hotels. The reduced
screed level also allows for
quicker reaction times when
adjusting room temperatures.
This not only boosts system
efficiencies, but is also useful
on a practical level as it can
be used in wet areas, such as
changing rooms, to dry floors
and reduce trip hazards.
Matt Lowe, managing director of Giacomini
UK, commented: “Due to the nature of the
work involved, screed warranties generally
do not span to ten years so we are delighted
to be able to offer this in conjuction with
our UFH systems. There is nothing like this
on the market so we are very pleased to be
able to offer this new level of reassurance to
customers.”
40
The first project to benefit from the new
warranty is Axon Power Headquarters in
Dungannon, Northern Ireland where a solid
floor has been installed in the reception,
boardrooms, offices, toilets and other
communal areas.
For more information please visit
www.giacomini.co.uk