DC Gearbox WeedRoller Owner's/Part Manual | Page 15

3 Section OPERATION 3.1 INITIAL OPERATION Check the WeedRoller frequently to make sure it is not blocked by debris (branches, rocks, or stumps) when using it for the first time, or anytime it is moved to a new location. Inspect it often until it can move freely over the lake bottom. • Operate the WeedRoller continuously (when waterfront is not otherwise in use) for initial clearing until area is cleared. Clearing can take from one day to one week. • Run the WeedRoller often enough to keep the area clear of weeds after it is initially cleared. Typically operation is 10 hours once every week. Time varies with conditions. • Gather and dispose dislodged weeds to prevent them from floating away and spreading. NOTE Typical owner installations will need 400-500 operating hours per season. Excessive use will cause unnecessary wear at shaft and coupler components. Crary Co. warranty covers one season or 1000 operating hours, whichever comes first. 51285 R121411 WeedRoller Owner's/Parts Manual 9