Data Driven Strategies for Improved Site Activation | Page 9
full visibility to all of the information stored in TEMPO. Additionally, the
data are utilized in the forecasting model for activation and enrollment.
Does it work? »
With a recent clinical trial, Clinipace Worldwide used the dCRO model
and start-up strategies discussed in this paper, such as conducting site
initiation visits prior to EC/IRB approval, execution of the contract, and
approval of essential documents. In previous trials, the average time to
open a site was 6 months. In this recent trial:
• One academic site opened in approximately 1 month
• One non-academic site opened in approximately 3 months
• Two academic sites opened in approximately 3 months
• To select 20 sites for the trial, 45 sites were approached
For each step in the process, the following average times were reached:
• 34 days between the regulatory packet delivered to the site
and submission to the EC/IRB
• 26 days for EC/IRB approval, from the date of submission
• 64 days for the contract to executed, from the date the regulatory
packet was delivered to the site
Figure 6. TEMPO was developed as one database that seamlessly
These times reflect ongoing advancements in the dCRO process within
integrates all of the trial lifecycle components, shifting the focus from
Clinipace Worldwide, with the utilization of additional and evolving
administrative tasks to the benefits of the team’s experience and
technology. Of note, the time for EC/IRB approval is highly dependent on
improved processes.
the type of site (central vs local IRB, Figure 6). While the dCRO process
The recognized benefits of a clinical trial management system, such
as TEMPO, include a better understanding of resources, improved
internal and external communication across all sites, reduced human
error in data entry and reporting, improved knowledge flow across all
operational departments, current and future management of clinical
data, and continuous monitoring and improvement of study processes
and performance.3 Clinipace Worldwide and all other stakeholders have
expedites the time to submission, the time to approval is based on the
EC/IRB processes and cannot be modified.
The team observed that the dCRO model provided full visibility, with
reports and metrics, to allow the focus to remain on the sites that
remained interested during the start-up process. Resources could be
appropriately applied to those sites and removed from the sites that did
not respond to the initial requests. With further dCRO model experience,
clinipace.com
8