Collinson Project List v2 | Page 104

VSD Avenue Chesterfield, Derbyshire Building Type: Challenger - Waste Remediation Facility Size: 51m x 30m x 8m minimum Completed: September 2010 Principal Contractor: Collinson Scope of Supply: Design and build of tensile structure including civils. Cost: £0.2m (+VAT) 15