City Manager's Bi-Weekly Report Vol 3 | Issue 7 | April 2019 | Page 14
PUBLIC WORKS
Protecting the environment and infrastructure.
SIDEWALK PROGRAM
•
•
•
•
•
Paar Drive – Savona Boulevard to Port St. Lucie Boulevard (0.8 miles) – FY 18/19 – City Funded
Paar Drive – Port St. Lucie Boulevard to Darwin Boulevard (1.0 miles) – FY 18/19 – LAP Funded
Southbend Blvd – Oakridge to Eagle (0.2 miles over bridge) – FY 18/19 – CDBG Funded
Floresta Drive – Prima Vista Blvd to Airoso Blvd (missing links/curb ramps) – FY 18/19 – CDBG Funded
Macedo Blvd – Selvitz Road to St. James Drive (1.0 miles) – FY 19/20 – LAP Funded
For more information about the City's Sidewalk Program, please visit: www.cityofpsl.com/sidewalks
STREET REPAVING PROGRAM
The street repaving goal for FY 18/19 is 34.6
miles. To date, 30 miles are complete. For more
information about the City's Street Repaving
Program, please visit: www.cityofpsl.com/repaving
CONSTRUCTION PROJECTS
Southern Grove Loop Road - Phase 2 construction is
ongoing. The contractor continues to work on roadway
embankment and installation of the FPL infrastructure
and they have started installation of the drainage
infrastructure. Delivery of the utility structure has
been delayed and is anticipated in April. This project is
scheduled for completion in September.
Village Green Drive - The City hired a contractor to construct a
southbound left turn lane on Village Green Drive at Spanish Lakes.
Progress is moving quickly as the paving has been completed
and curb is being installed. Once the sodding is complete and the
striping has been applied, the project will be complete.
City Hall Parking Lot - First lift of asphalt has been placed. New handicap stalls have been installed in front
of Building B. Construction of a sidewalk connection between Buildings A & B is underway. Light pole
relocation is also underway.