Where the budget and specification were
concerned, the Challenger structure ticked all
the boxes. The modern method of construction
for this type of build provided substantial cost
and time savings for the build schedule, releasing
money and manpower for use elsewhere in
the project whilst creating an energy efficient,
clear span space filled with natural light and
contributing a modern, distinctive build style to
the overall design. A close working relationship
began between the team at Watson Batty and the
architectural technologists at Collinson to ensure
the two buildings would be seamlessly linked
and complement each other in an aesthetically
pleasing way.
York St Johns’ Logo is printed externally onto
the architectural membrane cover, creating an
exclusive, personal finishing touch.
Collinson worked on the project as
sub-contractors for Triton Construction, who
designed and built the traditional style building
used to accommodate the fitness suite, changing
facilities, classrooms and conference space. The
new, state of the art facility was officially opened
to students in September 2016, and the University
already has agreements in place with a number of
local clubs and schools, including Rugby League
Club York City Knights who have been enjoying
training in the new facility to escape the harsh
winter weather conditions!
The Challenger facility is constructed from a steel
framed superstructure and covered with a heavy
duty architectural membrane which allows light
to permeate in creating a light, bright sporting
facility and reducing the need for artificial lighting
during daylight hours.
Covering 42m x 25m, the Challenger facility
accommodates 5 badminton courts with markings
for a range of sports including basketball, tennis
and 5 a side football, 3 separate storage rooms
providing ample storage for equipment and a
viewing balcony, for safe spectator viewing.
The integration of Collinson rebound walling
and Acoustik screening systems creates an
aesthetically pleasing walling solution whilst
improving and enhancing acoustic performance of
the facility for the comfort of players, spectators
and coaching staff.