Case Studies William Edwards Academy | Page 2

the Collinson team were able to design and build it adding their advice gained from years of designing sports facilities. “ We were impressed with the product itself and the assistance Collinson provided us with but the key in the end was that they were a family firm and treated us like their most important customer, we knew things would be done to a high standard and had confidence they would deliver exactly what we wanted and we were proved right. Peter Melville, Business Director Internally the layout incorporates 8 courts designed to Badminton England’s guidelines with elevated viewing galleries for match watching. The green and blue colours create a calming positive atmosphere and the lighting system is designed to ensure optimum playing conditions late into the night. Not only benefiting the school, the facilities are available for use by the local community and beyond, being a centre of excellence County and Regional matches are played on the facility, junior badminton coaching is also delivered on the site, whilst marked for badminton other sports including table tennis, fitness, athletics and games are played. ” Designed and built by Collinson, the facility comprises an 8 court Badminton facility, which is also utilised for multi sport, changing rooms and Fitness Suite. The Challenger sports structure system is based on a clear span, steel superstructure which requires minimal foundations and can be quickly erected. This modular system is renowned for it’s efficiency, the frame is covered with a tensioned PVC membrane which acts to enhance the playing environment with natural light, ensuring the courts are bright and airy. Profiled colour coated cladding had also been added for aesthetic and security reasons to a height of 3m on the exterior. Peter continued ‘We are more than pleased to be a Centre of Excellence for Badminton as the students get the opportunity to watch top level matches and aspire to this sporting excellence, and the level of interest in badminton has increased as a result, after-school clubs are full to capacity which is great as students vote with their feet’ What better endorsement than from the students the facility was designed for. T: 01995 606 451 collinson.co.uk Construction_WilliamEdwards_CS_Rev02