Case Studies Aysgarth School | Page 2

Evolution is an insulated steel framed superstructure which is covered externally in a range of materials to create the desired appearance to suit the client’s budget and aesthetic aspirations. These bespoke facilities can be fitted out internally to suit the client’s requirements for PE and sporting activities, together with ancillary areas for changing, offices, classrooms...the options are endless. The structure and flexibility of design gave Aysgarth the versatility they required and discussions soon started in earnest. The site was selected, being in close proximity to the sport grounds, the Prep School and Pre Prep School but a respectful distance from the School Chapel which is a listed building. The School were keen to minimise the visual impact of the development and therefore, although it added to the overall project cost, chose to reduce existing ground levels by about 2.5 metres so the new roof-line would sit level with neighbouring buildings. Naturally the School were anxious to know that the project would be delivered within budget, and as such it was vitally important for Andrew that he had a fixed price contract, but also that Collinson were able to incorporate additional features as the project developed, providing that the cost justified the benefit. Before a final specification was drawn up, a team from the School visited several projects completed by Collinson; they were impressed by what they saw and the visits also helped the School formulate a list of their exact requirements. Collinson undertook the design and build of the whole project, which commenced in July 2012. The wet summer followed by a very cold winter made challenging working conditions but the team drove forward maintaining the schedule. Excavated earth was utilised to create an additional pitch eliminating the need for costly off site removal; every aspect had been thought through. Eleven months later the facility was complete, designed with a brick and cedar facade, which nicely integrates the structure into the School architecture. Inside, the multi use surface is marked with courts for indoor tennis, 5-a-side football, volley ball, badminton and indoor cricket. There are 4 cricket nets which with foresight and good planning have been installed in a single net and 3 net configuration to allow one to one cricket training whilst other activities are taking place. There is also a climbing wall with six routes and a belay ledge which will provide fun and challenges for all. Ancillary rooms include; two team changing facilities with hot showers, referee changing, rehab room, staff gym and office area. The facility will also be utilised by visiting teams and is compliant with DDA regulations. There is a also viewing gallery to watch over the sports, lots of storage space and an area for the display of trophies is now being created. The investment was less than the cost of a traditional build, the Evolution Sports Facility made this possible for us. “ I am very proud of what we have here and I know Collinson are too. People ask would I use Collinson again, Definitely, I would also highly recommend them. We had an honest relationship and the result is an outstanding facility which offers the pupils a wealth of opportunities. Andrew Francis Estates and Finance Manager ” T: 01995 606 451 collinson.co.uk Construction_Aysgarth_CS_Rev02