STRUCTURE
Partitions are nearly complete and
shapes of rooms within the building
are almost formed. Mechanical
and electrical services are being
installed throughout the building
as well as a sprinkler system. The
suspended ceiling grid installations
have begun in the STEM block.
Ceiling tiles will soon be inserted
enclosing services and leaving a
finished surface behind.
SHAPE
Did you know that
the new Kilmarnock
Campus is shaped
similar to a letter A?
STYLE
The interior colours of
each floor will differ:
Ground Floor
First Floor
Second Floor
Third Floor