BYO Recreation 2016 Playground Catalog Volume 1 | Page 33

Site Planning Your Completed Playground Site Plan Planning Your Site Using images of your actual site, our design team will work Should you choose our NPSI certified Installation Team to install with you to incorporate your playground into your existing your playground, you will be provided with a 2D CAD of your property. From preparing the space, to planning and entire playground as it will appear in relation to your existing site. installing proper drainage, our CPSC Certified Playground You will be assigned a dedicated Project Manager who will assist Designers will help you plan your site in detail. you throughout the final stages of planning and installation. Things to Keep in Mind: • Location of existing structures • Location of nearby trees and overhanging limbs • • • (Must be 8” above highest playable surface.) Local codes and ordinances Location of underground utilities Nearest available electrical outlets and faucets Project Timeline: • Finalized site plan • Delivery of project packet • Pre-Installation conference • 1 Week prior to install: final timeline confirmed • Install begins • 24 Hours prior to completion: substantial completion • inspection • Immediately after install: Substantial Completion Inspection • 30 Days after final completion: Playground Operations and • Maintenance Package Here is a Top View of the Completed Custom Structure CALL TO LL FRE E : (8 00) 8 5 3-5 316 32