Building & Investment (Nov - Dec 2015) (Nov - Dec 2015) | Page 12

Project Highlight Reception area. Spa entrance. 40-metre-long and 6-metre wide passage made of glass and timber. From the lobby you are able to reach the four-storey adjoining building where 31 new standard rooms and 10 suites are located. The spa building is located on the east wing across 1,800 sq metre of space and is connected with the lobby area. Three new pools are located in the spa area: an indoor pool, an outdoor/indoor pool and a children’s pool. Adults can also relax in the large 500 sq metre sauna area. The core of the building is made of reinforced concrete while the facades are mainly glass and untreated timber, reflecting the local cultures and traditions. „ Spa pool. 8 Building & Investment | www.b-i.biz More information at www.n-o-a.it