Bosch Holdings Enginuity May 2014 | Page 11

11 Nursing College conditional assessments progressing well Bosch Stemele, Bosch Projects, the Development Bank of South Africa and the National Department of Health were involved in the conditional assessments of 121 nursing colleges across all provinces over the past 6 months. For this project an assessment team from each of the Bosch Stemele regional offices visited individual facilities to report on the condition and upgrading requirements per facility. Additionally, Bosch Stemele will assist with the initiation of a contractor procurement process to have seven facilities upgraded as part of the first phase of upgrades. The expansion requirements of each facility is also being considered, to ensure that forward planning is done that will take the required student increases, up to the year 2025, into account. To accomplish this, Bosch Stemele engaged with the CSIR to develop space norms for nursing colleges that are now being implemented to calculate the training room type and number to be added to each facility. These additions are then translated into Departmental budget requirements. This project forms part of the Department of Health’s wider strategy to improve the standard of health care in South Africa and Bosch Stemele is proud to be part of the solution. [email protected] Google Earth image of the facility locations inspected by Bosch Stemele Western Cape College of Nursing - one of the facilities inspected Bosch Munitech extends mechanical and electrical maintenance services to Ugu District Municipality Bosch Munitech was recently appointed to undertake mechanical and electrical maintenance services on the water and wastewater infrastructure within Ugu District Municipality. Bosch Munitech’s role is to augment the Client’s reactive maintenance capacity and to assist with unplanned maintenance and breaks in service. Works undertaken to-date have included: After-hours shuts and repairs to bulk water mains; Pump and motor stripping and repairs; Flood damage reinstatements; Road reinstatements; CCTV inspection of bulk pipelines; Pump station valve replacements; Emergency repairs to stormwater damage in Port Edward Various mechanical repairs at wastewater treatment works. Work in the Ugu District is supported by Bosch Munitech’s mechanical workshop in eThekwini and this capacity has proven to be invaluable in facilitating fast response times and in bringing additional resources to bear on the larger jobs. [email protected] Repairs to a pipe burst suspended under the Scottburgh bridge