Bosch Holdings Enginuity March 2016 | Page 4

04 Bosch Munitech and EWS Ensure Environmental Protection As part of its appointment by eThekwini Water and Sanitation (EWS) for the mechanical and electrical maintenance of wastewater infrastructure in the western area of the municipality, Bosch Munitech was recently called upon to replace a Motor Control Centre (MCC) panel at the Umhlatuzana Inlet Wastewater Pump Station. Bosch Munitech was tasked with building a temporary Motor Control Panel and with operating one pump on the existing diesel set to ensure that the incoming sewage flow to the pump station was directed to the Wastewater Treatment Works during the MCC installation process. The key challenge of the assignment was to undertake the work on a live system whilst protecting the environment by ensuring that no sewage spill occurred. Left: Neville de Swardt at the installation of the Motor Control Panels. The installation work was conducted over a continuous 40 hour period, requiring the utmost diligence and stamina from the implementation team comprising: Manager, Pierre Bigara; Foreman, Neville Crowley; George Louis; Siyanda Khumalo; Lucky Majozi; Sthembiso Mkhize and Nkululeko Jaca. JP Marnewecke was responsible for operating and maintaining the diesel generator during the process. EWS’ Engineer, Andrew Peinke, praised the efforts of the Bosch Munitech team stating, “A scintillating effort… your assiduous efforts massaging the gen-set through the temporary panel installation ensuring that not one drop of sewage was spilled, was sublime. A new benchmark has been established that augers well for all future projects constrained by environmental imperatives”. Pierre Bigara [email protected] Johannesburg Inner City Public Environment Upgrade comes to life The Johannesburg Development Agency (JDA), has continually worked at their long term goal to uplift the Johannesburg City Core public environment. In late 2014, the JDA appointed Bosch Projects, together with other professionals, to successfully initialise and complete the ICC Precinct Public Environment Upgrade Project. The main focus is to create quality public environments, which include capital works to strengthen pedestrian connections, upgrade recreational facilities, development of public transport priority routes and provide safe areas for pedestrians and informal traders. Aerial view of Johannesburg Inner City. The project area is fenced in by Jorissen (N), Wemmer Jubilee (S), Miriam Makeba (W) and End Street (E) in Johannesburg. Bosch Projects was appointed as Electrical Consulting Engineer on the team and services include: • Designing electrical infrastructure that is according to SANS, JDA and City Power standards • Providing effective street lighting for the traffic flow and Pedestrian walkways Power specifies, to ensure maximum benefit is received and enjoyed by the end user and care taker of the infrastructure. %