Beargrass Creek Trail Conceptual Shared Use Path & Ecological Restora Project Limits and Focus Areas | Page 50

Opportunities Include the following restoration measures :
• Measure A1 - Wetland restoration
• Measure B2 - Stream restoration
• Measure C / G1 - Stormwater bioretention and treatment
• Measure D1 / G2 - Bank stabilization
• Measure E1 - Wetland preservation
• Measure F1 - Interactive environmental station
• Measure G3 - Native planting and revegetation

Ecological Restoration Opportunities

Opportunities Include the following restoration measures :

• Measure A1 - Wetland restoration

• Measure B1 - Invasive species management

• Measure B2 - Stream restoration

• Measure C / G1 - Stormwater bioretention and treatment

• Measure D1 / G2 - Bank stabilization

• Measure D2 - Trash removal

• Measure E1 - Wetland preservation

• Measure F1 - Interactive environmental station

• Measure G3 - Native planting and revegetation

• Measure H1 - Rock vanes

Proposed channel during low flow
Existing channel during low flow
Proposed channel during high flow
Proposed stream restoration
Public Meeting # 3 -- December 6 , 2016