Arlington Comprehensive Plan Update Adopted 3-17-2015 | Page 86
Strategies and Actions
1
Maintain a roadway system that
provides efficient access to all
parts of the city.
1.1. Use street funding strategically
to rebuild all streets that have the
lowest condition rating.
1.5. Provide additional gradeseparated crossings at the Union
Pacific rail line in the Downtown and
Entertainment District areas.
2
Provide a variety of
transportation options.
2.1. Implement the Hike and Bike
System Master Plan.
1.2. Further optimize traffic
management and timing citywide
using Intelligent Transportation
Systems (ITS) technology.
2.1.1. Conduct a periodic analysis
of the Hike and Bike System
Master Plan to ensure planned
facilities and programs meet the
community’s needs.
1.3 Implement the Thoroughfare
Development Plan.
1.3.1. Conduct a periodic analysis
of the Thoroughfare Development
Plan to determine the best
solutions to maximize resources
and mobility and respond to
changes in projected growth.
2.1.2. Identify and complete high
priority projects identified in the
Hike and Bike System Master Plan.
2.1.3. Pursue designation as a
Bicycle Friendly Community.
1.3.2. Adopt a “Complete Streets”
Policy.
2.2. Explore transit options related
to the Metro ArlingtonXpress (MAX)
service including the evaluation
of transit service connecting the
1.4. Complete the Center Street
Bridge over Interstate 20.
80