Arlington Comprehensive Plan Update Adopted 3-17-2015 | Page 76
A sixth grade-separated crossing was
planned at Stadium Drive; however,
requests from Union Pacific to increase
the width of the rail line at this location
made the project financially unfeasible
at the time. There are currently no
plans to alter the at-grade crossings
of Cooper Street, Collins Street,
and Davis Drive despite significant
north-south traffic on these roads;
however, options for grade-separated
crossing through Downtown and/
or the E ntertainment District would
relieve some traffic congestion during
major special or community events,
and should continue to be considered
when funding is available.
70