Archetech Issue 37 2018 | Page 65

THE UPPER VOLUME RESTS ON THE LOWER ONE AND ON A CONCRETE PIER TO FORM BOTH A BRIDGE AND A CANTILEVER. THIS MASSING STRATEGY ALLOWS FOR INCREASED ACCESS AND PERMEABILITY OF THE SITE AND EMPHASIZES THE CHARGED RELATIONSHIP BETWEEN THE BUILDING AND THE GROUND.