Archetech Issue 35 2018 | Page 133

 Three new tennis courts have been placed at the end of the plot with the best possible sun exposure for play. The clubhouse is located near these new courts so as to create a tennis hub. A path enabling access for people with special needs makes it possible to reach the already existing indoor tennis courts via a landscaped passageway. The sun deck has direct access from the swimming pool and on a level with the door to the pool. It faces directly south to take full advantage of the sun. A space for snacks is located closely nearby on the terrace outside the bar-cafeteria. The roof over the stands is composed of a light frame supporting a metal cover with timber cladding on the under side. Although the stands’ 300-seat capacity abuts against the Sports Centre’s building, it is entirely independent in its use. There are 4 access points, three of which are free-standing: • a central access point from the pitch • two access points on either end of the stands for independent use •   and access directly into the entrance hall that can be opened or closed depending on needs The running track has been located between the football pitch and the tennis courts, enabling the separation of the two areas and preferential access. Complementarity  between the materials and the technical choices The Sports Centre marries the following: • textured and anti-graffiti-treated concrete with indoor insulation on the ground floor trellised concrete with occasional plantlife • • stained and saturated Scots pine cladding with exterior insulation on the upper floors construction systems: • Foundations of piles and structural slabs • Base and superstructure in concrete • A system of floor slab shuttering (prestressed slabs) • An insulated envelope, woodwork with thermal bridge breaks • Northeastern exposure and natural lighting favoured, with a goal of the level P equivalent of the HQE standard • Cogeneration gas boiler • Radiant panel heaters in the sport halls • Floor heating in the entrance hall, passageways and changing rooms • Overall double-flow ventilation • Quality artificial light: a uniformity coefficient of 0.7 • green roof technical sheet The Sports Centre combines a wide variety of elements from different briefs, i.e. already existent gyms, swimming pool and indoor tennis courts with new all-purpose halls, a boxing gym, a bodybuilding gym, two dojos, a football pitch with stands, outdoor tennis courts and a clubhouse. The new building is located to the west of existing buildings, uniting the whole with an entrance hall that acts as a bridge to all the facilities. A ground-floor green base supports a “wooden house” that contains the sports halls. Bathed in natural light the entire building offers warm and functional spaces. Location: Bezons (95) Client: Sadev 94—Bezons City Team: agence Engasser & associés Urbaine de Travaux (company) Incet (engineer) Meta (acoustics) Programme: multi-purpose arena, boxing hall, bodybuilding hall, two dojos, a football pitch with stands, outdoor tennis courts and a clubhouse, hall, bar, changing rooms. Area: 3,080 m² SP - 2,320 m² SU Budget: 7.3 M€ HT With 1.2 M€ for outdoors www.agenceengasser.com