Archetech Issue 33 2017 | Page 6

Faber Headquarters GEZA - Gri E ZuccHi ArcHiTETTi ASSOciATi PHOTOS: MassiMo Crivellari Faber Industrie Spa are world leading manufacturers of steel cylinders. Their new headquarters are located at a boundary between an industrial area and farmland, and hence belong to both, the industrial and the natural landscape. The aim of the project is to interface both landscapes and acknowledge their different qualities and values. Two Volumes The volume of the building is designed to “bring the two landscapes inside”, and integrate them in the new spaces. The building consists of two shifted longitudinal volumes linked by an entrance hall. Two Open Courtyards As a result, two “internal” open spaces are created, and controlled by views over the building and over the two landscapes. The designers here worked to obtain a reduced scale, i.e. the human scale, as opposed to the large-scale industrial area. While one courtyard is “hard”, lined with trees and conceived as a living area, the other courtyard is “soft”, entirely green and free, with an open visual depth eastwards, facing the manufacturing facilities and the mountains towards the Slovenian border. The Section and Head Fronts The notion of “double” is mirrored in the section, that is two “S” shapes. The corridor/office plan is inverted on the two levels: one totally blind side and one totally open side are overlapped, giving way to radically shifting open/closed fronts. The eastern head fronts of the office bodies actually highlight the S-section, while the western head fronts, where fire-exit stairs are accommodated inside wall panels, are closed and silent.