INDUSTRY NEWS
Crafco GeoTac HS Serves as Foundation for
$11.6M Pavement Preservation Project
Specialized polymer modified asphalt backing exceeds standards, preferred for bridge waterproofing
Pavement preservation manufacturer Crafco has
been chosen to provide materials for one of the
largest geosynthetic-based projects ever completed
by the state of Washington.
Led by the Washington State Department of Transportation
(WSDOT), the $11.6 million initiative includes the replace-
ment of three miles of bridge deck pavement along the US
2/I-5 Interchange in Everett. Crafco geocomposites will serve
as the foundation of the project, extending its longevity.
Composed of a resilient textile material with a specialized
polymer modified asphalt backing, Crafco GeoTacĀ® HS is This $11.6 million WS-DOT project, the largest geocomposite
project ever performed in Washington, leverages the unique
Continued on page 28 properties of Crafco GeoTac HS.
For More Information On This Advertiser Please Visit www.CallAPE.com/e-inquiry
www.callape.com
[26]
1.800.210.5923