HIGH-TEMPERATURE AIR-TO-WATER HEAT PUMPSā
61AF 022-105
61AF 075-105 units with and without hydronic module
2273
300
1330
2100
2053
1000
2261
1000
1
Legend
All dimensions are in mm
1
1000
Water inlet
Water outlet
Control box
1000
Recommended space for maintenance
Air outlet, do not obstruct
1
Required clearances for air flow
Power cable connection
HEATING
2
61AF 022-035 with option 11, units with and without hydronic module
1327
AIR TREATMENT
300
1371
1110
1280
1000
1000
1
2
1000
2
1
CONTROLS
1000
Notes:
A Non-certified drawings.
Refer to the certified dimensional drawings supplied with the unit or available on request, when designing an installation. For the location of fixing points, weight distribution and
coordinates of the centre of gravity refer to the certified dimensional drawings.
B In multiple-unit installations (maximum four units), the side clearance between the units should be increased from 1000 to 2000 mm.
C The height of the solid surface must not exceed 2 m.
C
A
R
R
I
E
R
2
0
1
6
/
2
0
1
7
419