Access All Areas February 2019 | Page 24

Protec Take a Bao Protec Take a Bao Bao Protec festival the year Protec deliver deliver full technical support on Dubai’s deliver full full technical technical support support on on Dubai’s Dubai’s EDM EDM festival festival of of of the the year B B ao ao did not disappoint! Massive crowds not disappoint! Massive crowds ao did did not disappoint! Massive crowds were attracted to to the phenomenal were attracted the phenomenal were attracted to the phenomenal Protec were called upon Protec were called upon Protec were called upon line-up of of world class DJs. Artistes line-up class DJs. Artistes line-up of world world class DJs. Artistes by client Envie Events by their client Envie Events by their their client Envie Events included included the top 2 2 DJs DJ Mag top 100 the top 2 DJs of of the DJ Mag top 100 included the top DJs of the the DJ Mag top 100 to support Martin Garrix, and Dimitri Vegas Mike to provide full full AV AV support for for to provide provide full AV support for Martin Garrix, and Dimitri Vegas & & Like Mike Martin Garrix, and Dimitri Vegas & Like Like Mike Afrojack, Don Diablo, as well well as heavyweights heavyweights Afrojack, Don Diablo, well as as heavyweights Afrojack, Don Diablo, ‘Bao: Final Frontier’ EDM ‘Bao: The Final Frontier’ EDM as as ‘Bao: The The Final Frontier’ EDM Nervo, R3hab and more. Nervo, R3hab and more. R3hab and more. festival at Racecourse, festival at Meydan Meydan Racecourse, Nervo, festival at Meydan Racecourse, Mel Deighton, Protec’s project manager, Mel Deighton, Protec’s project manager, Mel Deighton, Protec’s project manager, Dubai. Working with Envie Dubai. Working with Envie faced with considerable challenges along Dubai. Working with Envie faced with considerable challenges along faced with considerable challenges along previously on Sensation and the way, credits his team on delivering previously on Sensation and credits team delivering previously on Sensation and the the way, way, credits his his team on on delivering under pressure. under pressure. Unite with Tomorrowland, under pressure. Unite with Tomorrowland, Unite with Tomorrowland, “Due to to the complexity of of the production we “Due the complexity the production “Due to the complexity of the production we we Protec were delighted Protec were delighted to were on-site 11 11 days for set-up, 2 2 days for the Protec were delighted to to were on-site days for set-up, days for the on-site 11 days for set-up, 2 days for the continue this partnership and were show and we were fully loaded out 2 2 days later. continue partnership show we were fully loaded days later. continue this this partnership and and show and a and we were fully loaded out out 2 days later. It was challenging build which required It was a challenging build which required rise to the challenge on what, to the challenge on what, It was a challenging build which required rise rise to the challenge on what, cooperation with the staging company. cooperation with staging company. cooperation with the the staging company. according to baofestival.com, Our LED and lighting needed to according to baofestival.com, Our LED and lighting needed to be be rigged rigged according to baofestival.com, Our LED and lighting built needed to be rigged intermittently promised to be a ‘two day intermittently and and built into into the the structure structure promised to be a ‘two day intermittently and built into the structure promised to be a ‘two day which which took took some some extra extra time time and and careful careful extravaganza of unrivalled extravaganza of unrivalled which took some extra time and careful with planning. Unfortunately, we got extravaganza of unrivalled planning. Unfortunately, we got unlucky unlucky with entertainment Unfortunately, we got unlucky with the entertainment and and music, music, ’ ’ and and planning. the weather weather as as a a thunderstorm thunderstorm hit hit us us a a few few entertainment and music, ’ and the weather as a thunderstorm hit us a few days before show meaning our timeline was ‘a production of unparalleled days before show meaning our timeline was ‘a production of unparalleled days before show meaning our timeline was ample significantly ‘a production of unparalleled significantly affected. affected. Thankfully Thankfully we we had had ample show-stopping grandeur.’ show-stopping grandeur.’ resources and a committed team we to had ensure we significantly Thankfully ample resources affected. and a committed team to ensure we show-stopping grandeur.’ resources committed team to ” ensure we Protec’s Chris McAleese operated audio at FOH delivered and on a time and as promised. delivered on time and as promised.” Protec’s Chris McAleese operated audio at FOH delivered on time and as promised.” Protec’s Chris McAleese operated audio at FOH