ACC 304 All Assignments ACC 304 All Assignments | Page 139
b. street lights, sewers, and drainage systems cost.
c. private driveways and parking lots.
d. assumption of any liens or mortgages on the property.
27. If a corporation purchases a lot and building and subsequently
tears down the building and uses the property as a parking lot, the
proper accounting treatment of the cost of the building would depend
on
a. the significance of the cost allocated to the building in relation to
the combined cost of the lot and building.
b. the length of time for which the building was held prior to its
demolition.
c. the contemplated future use of the parking lot.
d. the intention of management for the property when the building
was acquired.