3rd Bosphorus Bridge. Michel Virlogeux. Izmit Bay Bridge. e-mosty June 2/2016 | Page 7

1.2 People and companies involved 1.2 Lidé a společnosti zapojení do projektu The Northern Marmara Motorway and the 3rd Bosphorus Bridge are constructed with the “Build, Operate and Transfer” model. Northern Marmara Motorway a 3rd Bosphorus Bridge jsou realizovány v režimu „Postav, Provozuj a Převeď“. The bridge concept design was developed by Dr. Jean Francois Klein and Dr. Michel Virlogeux, the detail design by T engineering, Switzerland/Turkey. Other companies provided specific design solutions. The construction was awarded as a result of an international tender launched by KGM (Turkish Ministry of Transport) and is executed by ICA, a Turkish-Italian joint venture formed by Içtaş and Astaldi. It also includes operation of the project – which has an investment cost of 4.5 billion TL (1.5 billion US$) – by the IC İçtaş – Astaldi Consortium for 10 years, 2 months and 20 days which will be delivered to the Ministry of Transportation at the end of this period. Koncepční návrh mostu byl vyhotoven Dr. Jeanem Francoisem Kleinem a Dr. Michelem Virlogeuxem, projekt společností T engineering, Švýcarsko / Turecko. Další společnosti dodaly specifická řešení návrhu. Realizace mostu byla zadána na základě výsledku mezinárodní veřejné soutěže tureckým ministerstvem dopravy KGM turecko-italskému konsorciu ICA tvořenému společnostmi Içtaş and Astaldi. Zahrnuje také provozování projektu – jedná se o investici v hodnotě 4,5 miliardy TL (1,5 miliardy USD) – konsorciem IC İçtaş – Astaldi po období 10 let, 2 měsíce a 20 dní. Na konci tohoto období bude projekt předán ministerstvu dopravy. A Korean joint venture between Hyundai E&C and SK E&C named HDSK was selected as the EPC contractor for the bridge construction. A number of subcontractors dealt with specific tasks, such as Freyssinet for the stay cables. Korejské joint venture mezi Hyundai E&C a SK E&C s názvem HDSK bylo vybráno jako zhotovitel mostu v režimu EPC. Velké množství podzhotovitelů se podílelo na specifických činnostech, např. společnost Freyssinet pro závěsy. 2. STRUCTURAL SOLUTION OF THE BRIDGE AND OF THE HYBRID SYSTEM 2. KONSTRUKČNÍ ŘEŠENÍ MOSTU A JEHO HYBRIDNÍ SYSTÉM 2.1 Description 2.1 Popis The bridge combines two different transport solutions rail and road - within the same corridor and the same level, supported on a 58.5m wide steel deck. It will be the widest suspended bridge deck in the world. The main span is 1,408m in length, (world record for railway bridges) with two on-shore concrete towers 322m in height (the second highest concrete towers in the world), accommodating a two-carriageway motorway with four lanes in each direction, separated by a twin-track highspeed railway system in the centre. The bridge is also accessible to maintenance vehicles using the two walkways built along external edges of the deck which have a width of 2.5m. Most kombinuje dva druhy dopravy – železniční a silniční – ve stejném dopravním koridoru a na jedné úrovni. Doprava je vedena po 58,5 m široké ocelové mostovce, což ji činí nejširší zavěšenou mostovkou na světě. Rozpětí hlavního pole je 1 408 m