3rd Bosphorus Bridge. Michel Virlogeux. Izmit Bay Bridge. e-mosty June 2/2016 | Page 41

of caissons in the dry and wet docks, the caissons are towed to their final positions, sunk and placed on the gravel bed at -40 m below sea level. While caisson construction was proceeding, dredging works were carried out at the foundation locations by a grab dredger over an area of 87 m by 74 m and up to 5 m depth. Some 195 inclusion piles of 2.00 meter diameter and up to 35 meters long were driven by an underwater hydraulic hammer. The gravel bedding was placed using a tremie pipe mounted on a floating barge crane, and the surface of the gravel was levelled by specially manufactured hydro-mechanical levelling equipment. kesonů v suchém a zaplaveném doku byly kesony umístěny do finální pozice, zaplaveny a uloženy na štěrkové lože v hloubce 40 metrů pod úrovní hladiny moře. Než se dokončily kesony, byl v místě základů vybagrován prostor o rozloze 87 x 74 m, s hloubkou až pět metrů. Pro zlepšení základové půdy bylo pod vodou pomocí hydraulického beranidla do podloží vetknuto cca 195 pilot o průměru 2 metry, s délkou až 35 metrů. Roznášecí štěrkové lože bylo vytvořeno pomocí betonářské roury osazené na člunu s plovoucím jeřábem a povrch štěrku byl vyrovnán speciálně vyrobeným hydromechanickým vyrovnávacím zařízením. Sinking of caisson tower foundation Submerging the caisson, including the steel shaft, is carried out by pumping in ballasting water as the caisson is kept in position. The caisson is divided into a number of cells. The cells at four corners are filled with water to provide stability. The plinth and tie-beam construction is the final stage of the construction of the tower foundation and is carried out in the following sequence: concrete casting of the upper part of the steel shaft, placing prestressed concrete cover inside the steel shaft followed by concrete casting of the plinth up to +2.0m, installation of the anchor bolts to connect the steel tower to the foundation, concrete casting of the plinth to its final height, and construction of the tiebeam. 2/2016 Keson včetně ocelové šachty byl po umístění do stanovené pozice ponořen zatížením balastní vodou. Keson je rozdělen do velkého množství komor. Komory ve všech rozích jsou naplněny vodou a tím dávají kesonu stabilitu. Spodní část (podstavec) a ztužidla jsou zhotoveny v poslední fázi realizace založení pylonů souběžně s betonáží horní částí ocelové šachty, následované betonáží podstavce až do +2,0 metrů, instalací kotevních šroubů pro připojení ocelových pylonů k základům. Nakonec proběhla betonáž podstavce až do finální výšky a realizace ztužidel.