2. 4 Tower Foundations 2.4 Založení pylonů The tower foundations are designed as concrete caissons placed on a 5 meter thick gravel bed on improved soil at -40 m and -35 m below sea level for the north and south foundations. This allows the tower foundation to slide during a strong earthquake without transferring a huge seismic force into the bridge system. The soil below the caisson is improved by 2m diameter steel inclusion piles driven to a depth of about 35m below the sea bed providing the required bearing capacity and eliminating potential risk of liquefaction during earthquake. The 5 m thick gravel bed separates the improved soil and the concrete caisson to provide a controlled sliding surface during seismic events. The purpose of the gravel layer is to act as a ‘fuse’ under seismic loading by limiting the maximum interface shear friction and thereby reducing the seismic loads on the structure for high amplitude earthquakes. Pro založení pylonů byl navržen betonový keson umístěný na štěrkovém loži na zlepšených zeminách v hloubce 40 m (severní část) a 35 metrů (jižní část) pod hladinou moře. Tento způsob založení umožňuje pohyb základů pylonů při silném zemětřesení, jehož účinky tak nebudou přenášeny na hlavní nosnou konstrukci mostu. Zemina pod kesony byla zlepšena vetknutím ocelových pilot o průměru 2 m do hloubky cca 35 m pod úrovní dna moře. Toto opatření poskytlo požadovanou únosnost a snížilo riziko ztekucení během zemětřesení. Pět metrů silná štěrková vrstva odděluje zlepšené zeminy od betonových kesonů a poskytuje řízený kluzný povrch během seizmických událostí. Štěrková vrstva působí jako pojistka při seizmickém zatížení tím, že sníží maximální plochu smykového tření a tím sníží seizmické zatížení konstrukce při zemětřeseních velkých amplitud . 3. CONSTRUCTION 3. VÝSTAVBA 3. 1 Tower Foundations 3.1 Založení pylonů The two tower foundation caissons were partially constructed in a -7.8 meters deep dry dock with the base slab and outer walls fully cast in three stages, and the inner walls being partially built. After floating, they were then towed to the wet dock, where the inner walls were completed, the top slab cast and the steel shafts installed, the lower part also having its concrete cast. To achieve the 100 year design life requirement, very high concrete quality is needed, with a low chloride migration ratio, low permeability and low heat of hydration. Following the completion Pro založení pylonů byly v suchém doku v hloubce -7,8 m částečně sestaveny dva kesony, se základovou deskou a obvodovými zdmi plně b etonovanými ve třech etapách, a s částečně zabudovanými vnitřními příčkami. Potom byly přetaženy do zaplaveného doku, kde byly dokončeny vnitřní příčky, vybetonována horní deska a instalovány ocelové šachty. Také byly dobetonovány spodní části. Protože je návrhová životnost 100 let, bylo třeba použít velmi kvalitní beton s nízkým obsahem chloridů, nízkou propustností a pomalým vývojem hydratačního tepla. Po dokončení 2/2016